Bored pier inspection in Tallawong

Holes, cages and bases checked while the ground is still open.

  • Piers drilled and cages in, concrete not yet ordered
  • About 1 hour on site
  • Report within 24 hours
Request a quoteSend your details and an inspector will ring you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookPiers drilled and cages in, concrete not yet ordered
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Tallawong bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Tallawong builds

Tallawong sits on clay over shale, and lots that were cut or filled during the estate works can need piers to reach firm ground under part of the slab. When piers are specified, their depth and the steel inside them are the first structural decisions on the job and the last ones anybody will ever see. The beam steel that ties into the pier tops is the next thing checked, at slab stage, and the two visits are best read together.

What we find at this stage in Tallawong

  • Pier depth reaching the founding layer on the engineering
  • Hole diameter matching the drawing
  • Cage centred with cover on every side
  • Base clean, dry and free of loose spoil
  • Starter bars set to lap with the beam steel

The other stages of a Tallawong build

  1. Slab pre-pour inspection in Tallawong2Slab pre-pourSteel, pods and membrane in place, the day before concrete
  2. Frame inspection in Tallawong3FrameFrame standing and roof on, before any wrap or lining
  3. Lock-up (pre-plaster) inspection in Tallawong4Lock-up (pre-plaster)Walls, roof and external doors done, plaster not yet hung
  4. Fixing inspection in Tallawong5FixingDoors, stairs and joinery fitted, painter booked next
  5. Waterproofing inspection in Tallawong6WaterproofingMembrane cured, tiler not yet started
  6. Pre-handover (PCI) inspection in Tallawong7Pre-handover (PCI)About two weeks ahead of the handover date

All construction stage inspections in Tallawong →

Guides

Construction stage guides for Tallawong

All guides →

Book a bored piers inspection in Tallawong

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Tallawong: common questions

Does every Tallawong slab need piers?

No. Plenty of lots here need nothing deeper than a waffle or raft slab. Piers appear where the engineer needs to reach deeper ground, often along a cut or filled edge, and the engineering drawing will show them.

What does the pier inspection actually check?

Depth, diameter, the position of the cage in the hole, the cover around it and whether the base is clean. Each is compared with the engineering for your lot.

Can a pier be checked after it is poured?

Not without coring or excavation, which is why this visit happens with the hole open and the concrete not yet ordered.

Who else inspects the piers?

The engineer or principal certifier may also attend. Our visit is independent and reports to you, not to the builder.

How long is the inspector at a pier visit?

Usually under an hour, depending on how many piers there are and whether they can all be reached safely.

What standards apply?

AS 2870 for residential footings, the National Construction Code and, above all, the engineering drawing that sets the pier schedule.